Skip to main content

How to choose a booth builder: a buyer's RFP checklist

12 min readLast reviewed November 20, 2026

The short answer. Choose a booth builder the way you would choose any large supplier. Send every builder the same brief and ask each one to price the same list of elements in the same format. Check storage, who will be on site, how changes are priced and the references. Score the bids on one weighted sheet, then decide on the answers and not on the rendering.

Who this page is for

You are the exhibitor. You pay for the booth and you are about to pick the company that designs and builds it. The company goes by several names: booth builder, exhibit house, exhibit builder, exhibit provider or exhibit partner. The trade press calls it an exhibit house; this page says booth builder. This page names no booth builder and ranks none. It is written for the buyer. The questions come from EXHIBITOR Magazine pieces by exhibitor-side managers and consultants and from the official contractors' own forms. A builder's own site shows what that builder offers.

Write the booth design brief before you start. The same brief goes to every builder, so the bids can be compared. The trade show checklist for exhibitors puts this at stage 4.

The process in five steps

  1. Decide what you are buying. The request can be design only. It can be design and build. It can be full service. Separating design from build lets you compare construction costs on the same design. If the builders that respond do not offer maintenance and storage, you may need another request to choose a firm for those jobs (EXHIBITOR Magazine, "The 10 Keys to RFPs", Candy Adams).
  2. Send a request for information. An RFI screens the builders before the proposal. Adams suggests it carry the project details, the deadlines and any nondisclosure agreement. It then asks for financial stability, organization, a client list and project management capability. An exhibitor-side account of a new build used an RFI with 9 categories and found it too detailed. The author recommends trimming it to what matters most (EXHIBITOR Magazine, "A Newbie's Guide to New Builds", Rebecca Dop).
  3. Narrow the field. In the same account, 11 firms were too many to manage well. Another EXHIBITOR piece speaks of selecting "a handful" of builders before the RFP (EXHIBITOR Magazine, "15 Questions to Find Your Perfect Match", March 2014 issue).
  4. Send the RFP to the short list. The RFP in that account had 6 parts: a company overview, marketing strategies, challenges and objectives, services, photos of existing properties and a budget range. Set firm deadlines and keep the question-and-answer process open to all builders. Ask for creative concepts before pricing, so cost does not overshadow the design (Dop).
  5. Score the bids, check the answers and decide. See the sections below.

Compare bids on the same list

EXHIBITOR sources agree on comparison. All bidders should price the same list of elements in the same format. A firm that refuses may resist other reasonable requests later ("15 Questions: What You Need to Know to Pick the Perfect Exhibit Provider", about 2022). The 2014 "15 Questions" piece also says the RFPs should be formatted consistently so they can be compared fairly. Adams asks for a rate sheet that shows how each service is billed and a line-item budget for easier comparison.

On the budget in the request, the two accounts differ. One shares a ballpark range and invites ideas beyond it (Dop). The other leans toward sharing a large part of the budget with a small reserve kept back (Adams). Decide with finance how much to share. Share the same with every builder.

The RFP checklist

Use the table as your list of questions. The last column says where each question comes from. Where it says "this guide", the question is ours and rests on the show kit rules named in the notes below the table.

The RFP checklist
TopicWhat to askWhere it comes from
Focus and historyIs your primary focus design, service or cost? How did the company start and how did it grow? If it has several locations, do they work in one system?"15 Questions: What You Need to Know to Pick the Perfect Exhibit Provider" (about 2022)
DesignWho designs my booth and how many rounds of revision are in the price? Show me concepts before priceDop; the 2022 article on revisions
BuildWhere will it be built? What do you outsource and what markup do you add to outsourced work?The 2022 article
StorageWhere will my exhibit be stored? Do you have more than one facility? What does storage cost and what does it include?The 2022 article; Adams
Install and dismantleWho will install and dismantle on site? Do you plan to work as my exhibitor-appointed contractor? Who files the notice and the insurance certificate and by what date?This guide, from the contractor rules in the notes below
Account teamWho is my account executive and how much of that person's time do I get? Who else is assigned to my account and is that person a seasoned trade show veteran or a contractor who might leave within a year?The 2022 article; an EXHIBITOR Magazine Q&A on RFPs (Glenda Brungardt, about 2017)
ShippingWho books and pays the freight to the show and home? Do you ship to the advance warehouse or to the show site?This guide, from the material handling rules in the notes below
Rental or ownHow much of your work relies on rental inventory and where is it kept? Can you propose a hybrid of rented structure and my own graphics or custom parts?The 2022 article; EXHIBITOR Magazine, "Rental Rookies: A Primer" (about 2023)
InsuranceWhat does your policy cover while my exhibit is in your warehouse and in transit? What must I insure myself? Which certificates will you send the show and for which limits?This guide, from the insurance rules in the notes below; Adams lists insurance in total cost
Price and changesGive me a list of typical add-on fees. How are design revisions, material changes and work outside the agreed schedule charged? Is account executive time billed hourly or at a flat fee and is your labor unionized?The 2022 article; Adams for the rate sheet
Total costWhat is the estimated total cost over the exhibit's 3 to 5 year life, including shipping, labor, maintenance, storage and insurance?Adams
References and financesShow me your financial position and a client list. Give me references and let me visit your facilityAdams; Dop
Fit with my showsHow many of your clients exhibit at my top shows? How large is my account beside your largest accounts?The 2022 article
DisruptionHow would you handle a show cancellation or a change of plan?The 2022 article

Notes for the rows that rest on show rules:

  • Exhibitor-appointed contractor. A company other than the show's official contractor that needs access to your booth to install and dismantle is called an exhibitor-appointed contractor in the GES page and in the Shepard manual. GES asks for the notice of intent a minimum of 30 days before move-in and the certificate of insurance at least 30 days before move-in (GES, "Exhibit Insurance and EAC's Explained"). At a 2025 Shepard show in Phoenix the deadline was Friday, February 7, 2025. Without the form, the insurance and the payment forms by that date, the contractor could not work in the booth except to supervise the official labor. It also had to keep its operations inside the exhibit area (Shepard exhibitor service manual, 2025). Your kit sets the real date.
  • Powered equipment and exclusive services. The same Shepard manual said exhibitors and their appointed contractors may not operate any mechanical or powered equipment, including forklifts and pallet jacks. It said an appointed contractor may only provide services the facility or the organizer has not made exclusive to another provider. Your builder works inside those lines, so ask it how it will handle them at your show. The service kit guide lists the forms.
  • Freight. At the 2025 Shepard show, exhibitors and their hired contractors and carriers could not deliver freight to exhibit spaces. Material handling was billed by the official contractor (Shepard exhibitor service manual, 2025). Ask the builder who orders material handling at your show. The drayage guide explains the charge.

Rent, own or mix

The rental primer in EXHIBITOR Magazine lists what decides the choice: whether your shows overlap, how often you will use the same exhibit and whether you can pay for maintenance and storage between shows. One expert in it suggests renting if you will use the exhibit fewer than 4 times a year. The article calls it a guideline and not a fixed rule. It also describes hybrids such as a smaller owned booth with rented parts for a larger show. Ask each builder to price rent, own and hybrid if your show plan could use more than one.

Score the bids

Adams suggests stating which factors matter most, such as cost, design, function or project management, using a weighted scoring system and sharing the criteria with the stakeholders, so the choice does not rest on looks alone. Dop scored presentations on 9 criteria and used the scorecards to guide the discussion and not to make the final call. The same account checked financials, called references and visited facilities. The team did not visit its current booth builder. The author says it is worth including your current builder in the visits.

Below is a sample comparison. The builders A, B and C are sample labels and not real companies. The weights and the scores are sample numbers. Set your own weights before you open the bids. Score each from 1 (weak) to 5 (strong). Multiply each score by its weight and divide the total by 5 for a score out of 100.

Score the bids
Criterion (sample weight)Builder ABuilder BBuilder CWhat to write beside the score
Design fit with the brief (25)453Concepts against your goals and the show's rules
Price clarity and add-on fees (20)325Line items in your format and the list of add-on fees
Build and the team on site (15)434Who installs and who supervises
Storage, rental and reuse (15)532Where it is stored and what it costs over the exhibit's life
References and finances (15)435What the references said and what the financial check showed
Account team (10)345The people you will deal with and their time
Weighted score out of 100776878Sum of weight × score, divided by 5

How the totals work in this sample: Builder A is 25×4 + 20×3 + 15×4 + 15×5 + 15×4 + 10×3 = 385. Then 385 ÷ 5 = 77. Builder B is 340 ÷ 5 = 68. Builder C is 390 ÷ 5 = 78. In this sample Builder C scores one point above Builder A. The two are close enough that the written answers on price, storage and the team on site should decide, which is the point of keeping the evidence column.

After the decision, tell the builders that did not win and explain why. Dop's team sent a letter and then called.

Two warning signs and one thing to settle

  • A builder that will not price the same list in the same format. The 2022 EXHIBITOR piece says it may resist other reasonable requests later.
  • A builder that misses early deadlines in the process. In one exhibitor's account, missed early deadlines could predict later problems (Dop).
  • Settle before you sign: where your exhibit will be built and stored. Both "15 Questions" pieces (2014 and 2022) say to know it before the contract.

A one-page checklist to run

  1. The brief is written and has the show's display rules and dates in it.
  2. You decided between design only, design and build or full service.
  3. The RFI went to the long list and the RFP goes to a short list.
  4. Every builder prices the same list in the same format with line items.
  5. You asked every question in the table and wrote the answers down.
  6. You called the references and checked the financials.
  7. You scored the bids on weights you set before you opened them.
  8. The winning builder has the show's dates for graphics, hanging sign approval and the EAC notice (the notice that you will use an exhibitor-appointed contractor). Put them in one list as in how to read the exhibitor manual and build your master list.
  9. The decision, its score and its reasons are in the show's file. Put the winning price in the trade show budget template.

About these sources

The process and the questions come from EXHIBITOR Magazine: "The 10 Keys to RFPs" (Candy Adams, about 2016), "A Newbie's Guide to New Builds" (Rebecca Dop, about 2016), "15 Questions: What You Need to Know to Pick the Perfect Exhibit Provider" (about 2022), "15 Questions to Find Your Perfect Match" (March 2014 issue), a Q&A on RFPs by Glenda Brungardt (about 2017) and "Rental Rookies: A Primer" (about 2023). The dates marked "about" are inferred from the pages' image paths because the pages show none. The contractor rules come from one GES page and the 2025 Shepard exhibitor service manual for a show in Phoenix. The score sheet uses sample numbers, labelled as samples. Your show's kit and your own bids are the facts for your project.

Frequently asked questions

How do I choose a booth builder?

Write one brief and send it to every builder. Ask for information before the proposal and send the request for proposal to a short list. Ask each builder to price the same list in the same format. Check where your exhibit will be built and stored, who will be on site, how changes are priced and the references. Score the bids on weights you set before you open them.

What is an RFP for a trade show exhibit?

A request for proposal is the document that asks booth builders to bid for your booth. EXHIBITOR Magazine's examples include a company overview, goals and challenges, the services you need, photos of existing exhibits and a budget range. The RFP can ask for design only. It can ask for design and build or for full service.

What should I ask a booth builder before I hire it?

Ask about its focus on design, service or cost, what it outsources and at what markup, where your exhibit will be built and stored, who your account executive is and how much time you get, its list of add-on fees, its financial position and its references. The table on this page has the full list and where each question comes from.

How many booth builders should I invite to bid?

One exhibitor-side account found 11 firms too many to manage well and recommends narrowing the field early. Another EXHIBITOR piece speaks of a handful. Send the RFI more widely and the RFP to a short list.

What is the difference between a booth builder and the general service contractor?

The general service contractor is the show's official contractor. It supplies services such as material handling and labor. At many shows it also publishes the exhibitor kit for the organizer. Internet is often the venue's own service. At some venues electrical is too. A booth builder designs and builds your booth. If it installs the booth it is an exhibitor-appointed contractor and the show wants a notice and an insurance certificate by a set date.

Should I rent or own my exhibit?

It depends on how often you use it, whether your shows overlap and whether you can pay for storage and upkeep between shows. One expert in EXHIBITOR Magazine suggests renting if you will use the exhibit fewer than 4 times a year. The article calls that a guideline and not a rule. A hybrid of rented structure and owned graphics is another option.

What is the difference between an RFI and an RFP for an exhibit?

An RFI screens the builders. It asks for financial stability, organization, a client list and project management capability. The RFP goes to the short list and asks for the bid itself (EXHIBITOR Magazine, Candy Adams and Rebecca Dop).

All guides

Where EVEXOS fits

EVEXOS (evexos.com) is the Exhibition ERP: one workspace for the team that runs the booth. At launch you drop the manual into EVEXOS. eveXana reads it and returns the deadlines, rates and rules. At launch every deadline has an owner, an escalation path and a price.

Places open in small groups.

Join the waitlist