The trade show exhibitor service kit, form by form
9 min readLast reviewed November 20, 2026
The short answer. The exhibitor service kit is the show's book of rules, dates and order forms. At many US shows the official contractor publishes it for the organizer. Read the rules and the deadline table first. Then go through the forms one at a time: material handling, electrical, internet, labor, furniture and carpet, cleaning, hanging signs, lead retrieval, A/V, plumbing, exhibitor-appointed contractors, insurance, outbound shipping, payment and tax. Each form can have its own deadline, its own vendor and its own login.
What the service kit is
The kit has many names: exhibitor services kit, service kit, exhibitor services manual or exhibitor manual. At many US shows the official contractor, called the general service contractor, publishes it for the organizer. A small show's kit is a few dozen pages. The largest run to several hundred (EXHIBITOR Magazine, "Form and Function").
Not every form comes from the general service contractor. Internet is often the venue's own service. Lead retrieval usually comes from a vendor the organizer chose. At some venues the venue supplies electrical too. Each of these has its own order site, its own deadline and its own payment.
Read it in this order
- The rules and regulations. What your own staff may do, what only union labor may do, fire rules and the contractor's terms.
- The move-in and move-out schedule. Find your target move-in time. It drives your freight and your labor plan.
- The deadline table. Then check each order form for its own date. One show can have different dates for different services.
- The payment terms. Most contractors need payment with the order to give the advance price.
EXHIBITOR Magazine gives the same order: rules first, then the schedules, then the deadlines ("X Marks the Start", 2025).
The forms at a glance
| Form | What you order | Deadline to watch | What catches people out |
|---|---|---|---|
| Material handling (drayage) | Moving your freight from the dock to your booth, storing empty crates and moving it back out | The warehouse window and your target move-in time | It is billed by weight on every shipment. Late or loose freight costs more. See the drayage guide |
| Electrical | Outlets by watts or amps. Labor for power under the carpet or overhead | The advance date, sometimes with payment and a floor plan | A wall outlet is not part of your space. Power used with no order on file can be charged at the show-site price (Freeman kit, C2E2 2022) |
| Internet | A wired line or Wi-Fi, by speed | Often the venue's own form and date | One venue's form bans your own Wi-Fi access points (Moscone Facility Services, undated form) |
| Booth labor | Install and dismantle (I&D) crews by the hour, forklifts and riggers | The advance date and the start time you book | Straight time and overtime hours differ by city. Often only a start at the beginning of the work day is guaranteed |
| Furniture, carpet and booth packages | Items or carpet by the square foot | The advance date | Some halls are not carpeted. Carpet can be required. Miss a package deadline and each item can be charged at the regular price (Shepard kit, 2025) |
| Cleaning | Vacuuming and porter service by the square foot | The advance date | It can be exclusive: at C2E2 2022 only Freeman could clean booths (Freeman kit) |
| Hanging signs and rigging | Labor, lifts and rigging for a sign | An approval date (it can be weeks before the main deadline) and a date for the sign to reach the warehouse | A sign that was not approved in time may not be hung |
| Lead retrieval | Badge scanners or an app | The vendor's own date, sometimes with three price tiers | It is a different vendor with a different login |
| A/V | Screens, computers and sound | The advance date | Power and internet are ordered on their own forms |
| Plumbing, air and water | Outlets for water, drain and compressed air | The advance date | Some kits ban bringing your own air compressor (Freeman kit, C2E2 2022) |
| Exhibitor-appointed contractors (EAC) | A notice that your own installer will work in your booth | A set date before move-in | A late notice can limit what your installer may do |
| Insurance | Proof of your liability insurance and your installer's certificate | With the contractor notice | The contractor limits its own liability. Insure your goods yourself |
| Outbound shipping | Who takes your freight home and the form that releases it | Before move-out | With no form or no carrier, freight can be sent back to the warehouse or with the contractor's carrier, at your cost |
| Payment | A credit card on file and payment with each order | With each order | An order without payment can be charged the standard price |
| Tax | Nothing to order | None | The rate can depend on the venue, the place of service or your headquarters |
Electrical
You order power per outlet by watts or amps. An island booth or a booth with several outlets can need a scaled floor plan with the order (Freeman kit, C2E2 2022). The show's electricians do the work in the floor and overhead. At McCormick Place your own staff may plug in their own equipment, but labor is needed for higher-voltage connections (Freeman kit, C2E2 2022).
Order power for every piece of equipment you plan to run. The C2E2 2022 kit banned sharing power with the booth next to you. Check the hours too. At C2E2 2022 power came on 30 minutes before the show opened each day and went off 30 minutes after it closed, unless you ordered 24-hour power (Freeman kit).
Booth labor
Labor is ordered per person per hour, with a minimum per person. The kit sets the hours of straight time, overtime and double time. They differ by city, by union and by contractor, so read the labor page of your own kit.
Two details catch people out. Often only a crew booked for the start of the work day is guaranteed to arrive then. Other start times can wait for the next free crew. And a cancellation needs notice: if it comes too late, the minimum hours are still charged.
You can supervise the crew yourself. The contractor can also supervise it for a fee. The kit says how the fee is worked out.
Exhibitor-appointed contractors and insurance
Many exhibitors use their own booth builder (the trade press calls it an exhibit house) to build the booth. The kit calls it an exhibitor-appointed contractor. You must tell the official contractor before move-in, on its form and by its date. GES asks for the notice at least 30 days before move-in. Your contractor then sends a certificate of insurance with the limits the kit sets.
If the notice is late, your contractor may be allowed only to supervise the official labor (Shepard kit, 2025). Some services stay exclusive to the official contractor even if you hire your own, such as cleaning or driving forklifts.
Insure your own exhibit from the day it leaves your building until it comes back. The contractors' terms limit what they pay for loss or damage.
Payment, price tiers and tax
Many contractors print two prices on each form: an advance price and a standard price. Some print a third, cheaper price for online orders or a higher one for orders on the show floor. To get the advance price, both the order and the payment must arrive by the advance date (Freeman kit, C2E2 2022).
A credit card on file is usually required, even if you pay another way. Show-floor orders are charged at the full price and paid on the spot.
Sales tax on show services depends on the state and on the service. One form can carry sales tax on one line, rental tax on another and no tax on labor. Ask your tax adviser. If your company is exempt, send the certificate the kit asks for before the show.
What being late costs
The price step after the advance date is real. In official price lists from four US shows (2025 and 2026), the standard price was 25% to 50% above the advance price. Furniture, carpet and A/V were about 40% more, material handling 25% more and electrical 26% to 50% more (Freeman, NAB Show New York 2025 and NAB Show 2026; NANOG 96; Edlen, Long Beach 2026). Those are single price lists, not an industry average. Each form and its source is in what trade show services cost after the advance deadline.
Your first hour with the kit
- Open the deadline table and copy every date into one master list. Then open each form and add any date it holds that the table does not.
- Give each date an owner and a back-up.
- Write the advance price and the standard price beside each date, from the same form.
- Mark the forms that come from a different vendor. Make a login for each one now.
- Check the rules on what your own staff may do. Plan labor from those rules.
- If you use your own booth builder, send it the contractor notice and the insurance limits today.
The method for the master list is in how to read the exhibitor manual and build your master list. The trade show checklist for exhibitors puts the forms in the order the deadlines arrive.
About these examples
The rules on this page come from named kits and publishers: Freeman's kit for C2E2 2022 at McCormick Place and its 2023 labor and material handling forms, Shepard's kit for a 2025 show in Phoenix, GES's kit page for a 2019 show and its guide to exhibitor-appointed contractors, the Inspired Home Show 2027 kit page, a Moscone Facility Services internet form and EXHIBITOR Magazine. They are examples of what kits say. Your show's kit is the rule for your show.
Frequently asked questions
What is an exhibitor service kit?
An exhibitor service kit is the show's book of rules, key dates and order forms for exhibitors. At many US shows the official contractor publishes it for the organizer. It is also called the exhibitor services manual, the service kit or the exhibitor manual. It holds the forms for freight, electrical, labor, furniture, cleaning and other services.
Is the exhibitor manual the same as the service kit?
Yes. Exhibitor manual, exhibitor services manual, service kit and exhibitor service kit are names for the same book of rules, dates and order forms.
Who sends the exhibitor service kit?
The general service contractor sends it for the show organizer. Some forms in it come from other companies: the venue may supply internet or electrical and the organizer chooses the lead retrieval vendor. Each of those has its own order site and deadline.
What should I order first from the service kit?
Order the items with the earliest dates first. Hanging sign approval and the EAC notice (the notice that you will use an exhibitor-appointed contractor) often come before the main advance date. Then order electrical, material handling, labor and furniture by the advance date, with payment, to get the advance price.
What is the advance price deadline?
It is the date by which an order and its payment must arrive to get the lower advance price. After it the standard price applies. In official price lists from four US shows (2025 and 2026), the standard price was 25% to 50% above the advance price. Check the date on each form, because one show can have several.
What is an exhibitor-appointed contractor?
It is a company the exhibitor hires to install and dismantle its booth, such as its own booth builder, in place of the show's official contractor. You must tell the official contractor on its form by its date and your contractor must send a certificate of insurance. GES asks for the notice at least 30 days before move-in.
Do I pay sales tax on trade show services?
Often yes, but it depends on the state and on the service. Freeman's forms say the tax can follow the venue, the place where the service is done or your headquarters. Read the tax line on each form and ask your tax adviser. If your company is exempt, send the exemption certificate before the show.
Can I set up my own booth at a trade show?
It depends on the venue's rules. At McCormick Place, for example, your own full-time staff may set up with hand tools and plug in their own equipment, but may not drive forklifts or other powered equipment (Freeman kit, C2E2 2022). Other venues are stricter. Read the labor rules in your own kit before you plan the build.