Skip to main content

Trade show drayage: how it is billed and how to cut it

8 min readLast reviewed November 20, 2026

The short answer. Drayage, also called material handling, is the charge for moving your freight from the loading dock to your booth, storing your empty crates and moving it all back out after the show. The show's official contractor does it and bills it by weight, per shipment, usually with a minimum. Late, off-target or loose freight costs more. To cut it, send fewer and fuller shipments, crate what you can, arrive inside the dates in the kit and check the weight ticket.

What drayage covers

At a trade show, drayage is not the truck that brings your freight to the city. That is your carrier. You pay it on its own bill. Drayage starts at the venue's dock. The official contractor unloads your freight, takes it to your booth, stores your empty crates during the show, brings them back at the close and loads your freight onto the outbound carrier (Freeman freight FAQ; GES, "Material handling made easy"). The material handling form is one form in the exhibitor service kit.

The official contractor is usually the only company allowed to move freight on the show floor. At one 2025 Shepard show in Phoenix, exhibitors and their own contractors were not allowed to deliver freight to the booth themselves (Shepard kit, 2025).

How drayage is billed

The three contractors we read (Freeman, GES and Shepard) bill by weight. You'll see one of three methods on the material handling form:

  • Per 100 pounds. The unit is called a CWT, for hundredweight. The weight is rounded up to the next 100 pounds. Each shipment pays at least the minimum weight the form prints (Freeman freight FAQ; Shepard, "Material Handling 101").
  • Per pound. Some forms charge by the pound with no rounding. At NAB Show 2026 Freeman printed one price per pound before the deadline and another after it. One Shepard kit in 2025 printed one price per pound with no minimum.
  • A flat price for a small package. A light parcel can pay one flat price. The weight limit for it differs by contractor.

Each shipment that arrives on its own is billed on its own, with its own minimum. That one rule is why several small shipments cost more than one larger one.

The form also sorts freight into types. Each type has its own rate:

How drayage is billed
TypeWhat it meansPrice
CratedFreight in crates or cartons or on skids, unloaded at the dock with no extra workThe lowest rate
Special handlingFreight that needs extra work: mixed loads, tight spaces, freight with no bill of lading. Parcel deliveries from carriers such as UPS and FedEx are often in this groupHigher
UncratedLoose or pad-wrapped goods. Also machinery with no lifting pointsThe highest rate

The names come from the Freeman and Shepard forms. Read your own form for the exact rule, such as how much loose freight makes a mixed load "uncrated".

Advance warehouse or direct to show

You can usually send freight to the contractor's warehouse before the show or straight to the venue during move-in.

Advance warehouse or direct to show
Advance warehouseDirect to show
When it arrivesInside a window that opens some weeks before move-in. The kit prints the first and last dayDuring move-in, at your target time
What it buys youYour freight waits in storage and goes to your booth before your team arrivesNo storage. Your carrier must arrive in its time slot
What it won't takeOften loose or pad-wrapped goods, very heavy pieces and hazardous freightFewer limits, but late or off-target freight costs more
PriceSometimes the same rate as direct, sometimes higherSometimes lower, but overtime days cost more

The warehouse is not always the cheaper choice. GES says its warehouse rate is the same as direct to show. A 2023 Freeman form printed a higher rate for the warehouse than for direct on-time delivery to the show. Compare the two rows on your own form.

What makes the bill bigger

  • Missing the dates. Freight that reaches the warehouse after its deadline or the show outside the window pays a higher rate. The price also steps up after the advance deadline: at NAB Show New York 2025 and NAB Show 2026 material handling cost 25% more after it (Freeman price lists). Each price list is in what trade show services cost after the advance deadline.
  • Missing your target time. Some contractors add a surcharge to freight that arrives off target.
  • Overtime and weekends. Freight handled on overtime or double time costs more per 100 pounds.
  • Loose freight. Uncrated goods take the highest rate.
  • Many small shipments. Each one pays its own minimum.
  • A wrong weight. All shipments can be reweighed. One 2025 Shepard kit charged a fee when the weight on the papers was too low.

Base rates rise too. In the United States material handling base rates rose 9.5% in 2025 and 21.3% since 2022 (The Exhibitor Advocate, 2025 Annual Survey of Exhibition Rates, from 224 exhibitor manuals in 23 US cities).

A worked example (sample numbers)

This example uses a sample rate of $100 per 100 pounds and a sample minimum of 200 pounds. These are not any show's prices. Use the rate and minimum on your own form.

A worked example (sample numbers)
Sample shipmentWeightBilled asSample cost
Box of literature, sent on its own120 lb200 lb (the sample minimum)$200
Crate, sent on its own310 lb400 lb (rounded up)$400
Two shipments sent apart430 lb$600
Box packed inside the crate, sent once430 lb500 lb (rounded up)$500
The same single crate at a sample late rate 25% higher430 lb500 lb$625

In this sample, packing the box into the crate saves $100. Arriving late costs $125 more than arriving on time. The same rules work at any rate: one shipment pays one minimum. Late freight pays the late rate.

How to cut your drayage bill

  1. Send one shipment, not several. Put small items in the crate. Use one bill of lading for pieces that travel together, so the contractor applies one minimum.
  2. Crate or skid what you can. Crated freight takes the lowest rate. Loose freight takes the highest and may not be allowed in the warehouse.
  3. Arrive inside the dates. Put the warehouse window and your target move-in time in your master list, with an owner, the day the kit arrives. The method is in how to read the exhibitor manual and build your master list.
  4. Tell your carrier the target time. Give it the address on the right label, the warehouse or the show site. They differ.
  5. Weigh it before it leaves. Ask for the certified weight ticket. Check the weight on the contractor's papers at the show and question a weight that looks wrong.
  6. Ship less. Print locally, hand out a link in place of brochures and use lighter crates.
  7. Rent heavy items at the show. Furniture and carpet rented from the official contractor are already on site, so they carry no drayage.
  8. Hand-carry small loads if the rules allow it. The Freeman and GES rules we read let your own staff unload a car by hand (the kit calls this a POV, a privately owned vehicle). The rules on vehicle size, carts and time limits are in your kit.
  9. Check the bill line by line. Match each charge to a shipment, a weight and a type.

Outbound: getting your freight home

After the show the contractor needs a Material Handling Agreement (its outbound bill of lading) from you for each outbound shipment. It says which carrier picks it up. Every piece needs a label. If you send no form or your carrier does not check in by the cut-off time, the contractor can send the freight with its own carrier or back to the warehouse, at your cost (Freeman kit, C2E2 2022; Shepard kit, 2025). Book the outbound carrier when you book the inbound one.

About these numbers

The 25% step after the advance deadline is from official Freeman price lists for two named shows. The 9.5% and 21.3% rises are from one named survey. The worked example uses sample numbers, labelled as samples. The billing rules come from named contractor forms and guides: the Freeman freight FAQ, its kit for C2E2 2022 and a 2023 Freeman form, Shepard's "Material Handling 101" and its 2025 kit in Phoenix and the GES material handling guide. The ways to cut the bill come from EXHIBITOR Magazine and from Freeman and GES hand-carry rules. Your show's form is the rule for your show.

Frequently asked questions

What is drayage at a trade show?

Drayage, also called material handling, is the charge for moving your freight from the venue's loading dock to your booth, storing your empty crates during the show and moving everything back to the dock after it. The show's official contractor does it. It is not the cost of shipping your freight to the city.

How is trade show drayage calculated?

The contractors we read charge by weight. Many charge per 100 pounds (a CWT), round the weight up to the next 100 pounds and charge each shipment at least a minimum weight. Some charge per pound. Crated freight costs less than special handling. Uncrated freight costs the most. Read the material handling form in your kit for the rates.

Why is drayage so expensive?

Each shipment pays its own minimum, so many small shipments cost more than one larger one. Late, off-target, overtime and loose freight pay higher rates. Rates also rise: US material handling base rates rose 9.5% in 2025 and 21.3% since 2022 (The Exhibitor Advocate, 2025 Annual Survey of Exhibition Rates).

Is the advance warehouse cheaper than shipping direct to the show?

Not always. Some contractors charge the same rate for both. Some forms print a higher rate for the warehouse than for direct on-time delivery. The warehouse buys you storage and delivery to your booth before your team arrives. Compare the two rates on your own form.

What is a CWT?

CWT means hundredweight: 100 pounds. For example, at a sample rate of $100 per CWT, each 100 pounds costs $100. On forms that round, a shipment of 310 pounds is billed as 400 pounds (4 CWT).

How can I lower my drayage bill?

Send one consolidated shipment in place of several small ones, crate or skid your freight, arrive inside the warehouse window or at your target time, check the weight ticket and ship less. Rent heavy furniture from the official contractor, because rented items carry no drayage.

Can I carry my own booth materials into the hall?

Often you can carry small loads by hand, but the rules differ by venue. The Freeman and GES rules we read let your own staff unload a car or van at the dock with hand carts inside a time limit. The Freeman rule bans pallet jacks and powered equipment. The GES sheet allowed a two-wheel dolly only. One 2025 Shepard show made its last move-in day hand-carry only. Read the rules in your own kit.

All guides

Where EVEXOS fits

EVEXOS (evexos.com) is the Exhibition ERP: one workspace for the team that runs the booth. At launch you drop the manual into EVEXOS. eveXana reads it and returns the deadlines, rates and rules. At launch every deadline has an owner, an escalation path and a price.

Places open in small groups.

Join the waitlist